Energy Storage Leasing

overview

In a collaboration with Gridspan Energy, we are introducing Mobile energy storage transmission (MEST). MEST is an innovative solution which complements the shortcomings of conventional electricity transmission; specifically, the techno-economic inefficiencies of subsea cabled transmission and small-scale diesel generation. This novel electricity delivery solution uses modular battery systems to transport electricity from one market to another via conventional freight systems.

In essence, MEST is a flexible alternative to conventional transmission that utilizes freight logistics, energy storage technology, and regional electricity price differentials to connect markets separated by large bodies of water or other substantial geographic features. In addition to using our mobile battery systems for MEST, our systems act as a 2-in-1 Storage & Transmission Solution; providing many of same benefits as stationary storage.

Benefits of Energy Storage Leasing

Our Energy storage leasing service is designed for seamless integration with existing power systems. With less then 15-minute setup and integration after transport, we are bringing efficient and greener energy solution in a mobile package to the most previously inaccessible locations.

  • Quiet, Efficient and Mobile
  • Plug-and-play, seamless integration with existing sources
  • Delivered, Installed and Maintained by us.
  • Lower electricity costs ~ 50%
  • Less expensive than diesel-only solutions
  • Clean and Emissions free
solar aircon

Applications

The system is designed for plug-and-play use, with the ability to connect to a site a few minute after delivery. This makes it flexible and easily adapted for any use case. The following are few notable use cases:

  • Emergency power supply for hostipital and clinics
  • Power sources for natural disaster relief camps
  • Backup power supply for School
  • Uninterruptable power supply solution for offices and hotels
  • Grid voltage and frequency control support.
  • …etc

Service timelinne

  • First stage: Letter of Intent, No down payment, development starts immediately upon signing.
  • Second stage:System manufacture and testing, 3 months to complete.
  • Third stage:Delivery and Installation, 1 month cycle.
  • Fourth stage:Service and monitoring, 18 month lease with renewable 5-year rate lock

Storage capacity

  • 125/500 kWh cost effective lithium Ion